Poplar Baths Redevelopment

Project Info:

Design Studio Project, Masters in Architectural Design (Part II)

Date:

Part II Year 2

Category:

Following a site visit to Poplar, Clare came across the closed-up Poplar Baths, a 1910’s swimming pool that was taken out of use in the 1980’s and has stood empty until being redeveloped in 2015.

Following the design studio brief of ‘future office’ Clare set about designing a combined office and community centre for Poplar. The concept was to provide office space for the single-practitioner architects in the local area so they could club together to win bigger projects, if they wanted to, or generally benefit from the studio-atmosphere. The close proximity to the refurbished swimming pool related back to the idea that architecture and building can be a key factor in the regeneration of run-down communities. In making this service accessible to local residents, they would be able to drive the regeneration of the area.

The design followed the split of the original Baths, with the architectural studio primarily on the site of the old second-class baths, and the first-class baths reconstructed as a new pool. The office desk linked the two together in a sinuous, boat-like structure that winds through both halves and all three levels.

This project enabled Clare to develop her understanding of community and regeneration, as well as teaching her the importance of concept development over a period of time. She was able to further her skills in 3D modelling, using Sketchup and VRAY to produce my final images. Clare used the skills learnt in her Part I placement year to develop a building plan that was feasible and well thought-through.

Poplar Baths Redevelopment
The pool at rest
Poplar Baths Redevelopment
Site plan with textured detail, shwoing the office sat next to the existing 1930's swimming baths
Poplar Baths Redevelopment
The offices and swimming pool from across the road
Poplar Baths Redevelopment
Basement floor plan - changing rooms, plant and office storage were housed on this floor
Poplar Baths Redevelopment
Ground floor plan
Poplar Baths Redevelopment
First floor plan
Poplar Baths Redevelopment
Second floor plan
Poplar Baths Redevelopment
Section AA through the atrium, workshop and the pool
Poplar Baths Redevelopment
External night view, showing how the glow of the swimming pool is visible through the building
Poplar Baths Redevelopment
An early render of the pool, workshop and office soaring overhead
Poplar Baths Redevelopment
A concept sketch for a walkway over the pool linking two parts of the office together
Poplar Baths Redevelopment
Concept collage looking at shapes and cutting out views
Poplar Baths Redevelopment
Model of the concrete structural columns and roof
Poplar Baths Redevelopment
Initial sketch plans
Poplar Baths Redevelopment
The continuous desk - sketch ideas for the strucutre and use
Poplar Baths Redevelopment
The continuous desk - sections of the final design proposal showing the different uses and zones
Poplar Baths Redevelopment
Render of the office structure with notes to show how the building was detailed and clad
Poplar Baths Redevelopment
Detailed section through the office, showing how it cut through the wall of the Baths and the heating system